New Customer Onboarding Checklist for Solar Installers

Solar jobs are high-ticket and high-risk: you’re on rooftops, around live electrical, and you can’t safely grab your phone when a lead calls. This checklist helps you capture every $15,000–$200,000 opportunity, set clear expectations, and run a smooth first install—without missed calls, rework, or permit delays.

0 of 43 completed0%

1) First Contact (Calls, Web Leads, After-Hours Voicemails)

2) Intake + Required Documents (Before You Quote)

3) Quote, Expectations, and Signing (Avoid Scope Creep)

4) Schedule + Pre-Job Prep (Permits, Materials, Crew, Customer Readiness)

5) Install Day + Day-Of Communication (Rooftop + Electrical Reality)

6) Post-Job Follow-Up (Inspection, PTO, Warranty, Recurring Service)

Pro Tips

  • 1.Build a “rapid triage” script for emergency calls: ask if the inverter shows an error code, if breakers are tripped, if there’s visible damage, and whether there’s a roof leak. Then decide: same-day dispatch vs scheduled service.
  • 2.Keep a standard photo checklist for every site survey: meter, main panel (open), roof planes, attic access, grounding/bonding points, and a wide shot of the street for parking/ladder setup.
  • 3.Pre-label a job folder with the AHJ’s typical requirements (placards, rapid shutdown labels, fire setback diagram). Most inspection failures are paperwork and labeling, not hardware.
  • 4.During peak season (summer + tax-credit deadlines), set auto-text updates: “Got your request,” “Site survey booked,” “Permit submitted,” “Install scheduled,” “Inspection requested,” “PTO submitted.” Customers relax when they see progress.
  • 5.For commercial, always confirm shutdown windows in writing. A 15-minute unexpected outage can become a major relationship problem with tenants or operations teams.

Frequently Asked Questions

What info do you need on the first call for a solar install?

Get the service address, job type (residential/commercial/battery/repair), roof type and age, and the last 12 months of electric bills. Also ask what they want (lower bill, backup power, replace an old system) and set a site survey time before ending the call.

Why do customers say “my system isn’t producing” and what should you ask next?

Most “not producing” calls are inverter faults, tripped breakers, monitoring offline, or storm damage. Ask if the inverter has an error code, if any breakers are tripped, if there’s visible roof damage, and if they see production in the monitoring app.

When should the system be turned on—right after install or after PTO?

It depends on your utility and inspection rules. Many areas require inspection and PTO (permission to operate) before you leave the system on. Tell the customer the exact plan in writing the day of install to avoid confusion.

What documents slow solar projects down the most?

Missing utility bills/account details, unsigned interconnection forms, and incomplete electrical/roof photos. For commercial jobs, missing roof warranty terms and structural info can also stall engineering and permitting.

How do you handle calls when you’re on a roof and can’t answer?

Set a clear expectation: “We can’t answer while on the roof for safety.” Use a dedicated ground contact for day-of updates and a system to capture new leads and book site surveys automatically (an AI answering service can help).

What’s a smart recurring service offer after installation?

Offer a 6- and 12-month production check and monitoring support. For commercial, add an annual inspection package (thermal/IR scan, attachment check, and labeling review) to catch issues before they become downtime.

Stop losing solar leads while you’re on the roof

If you install residential and commercial solar and can’t safely answer calls during rooftop work, use SkipCalls to capture every lead, filter spam, and book site surveys 24/7—so the next $15,000–$200,000 job doesn’t go to the fastest competitor.